Integrated Vector and Chorus Civil Infrastructure Upgrade
#vector#chorus

Integrated Vector and Chorus Civil Infrastructure Upgrade

Auckland | HV and LV Network Civil Works | Telecommunications Civil Works

CIVILINK NZ

July 10, 2026

11 kV

HV network

300 kVA

Transformer

HV + LV

Vector civil

Chorus

Telecom civil

Integrated Vector and Chorus Civil Infrastructure Upgrade

Auckland | HV and LV Network Civil Works | Telecommunications Civil Works

Civilink NZ delivered an integrated civil package supporting a major Vector electricity network upgrade and the coordinated undergrounding of Chorus telecommunications infrastructure. The works provided civil readiness for a new 11 kV switch, a 300 kVA ground-mounted transformer, HV jointing, LV service infrastructure and separate Chorus ducting.

Working within an active public road corridor, the team coordinated service locating, traffic management, staged excavation, HV and LV duct installation, Chorus duct installation, equipment foundations, joint-bay access, backfilling, reinstatement and as-built documentation. Each utility system was maintained as a clearly identified and independently compliant workstream.

Separate green Chorus ducts installed beside the electrical civil corridor
Separate green Chorus ducts installed beside the electrical civil corridor

Key Delivery Features

  • Civil preparation for new HV switch and 300 kVA transformer assets
  • Two 150 mm HDPE HV ducts plus dedicated HV and LV routes
  • Separate Chorus telecommunications duct system
  • Controlled interfaces with existing live underground services
  • Coordinated road-corridor access, reinstatement and as-built handover

Project Outcome

The completed civil infrastructure created compliant, clearly separated pathways for both electricity and telecommunications assets, allowing Vector and Chorus to undertake their respective specialist cable, connection, testing and commissioning activities.

On Site

Project Photos

Separate green Chorus ducts installed beside the electrical civil corridor

Vector electrical ducts with warning-board protection

Vector HV civil: joint bay, switch and transformer duct alignment

Vector LV civil: extended supply duct alignment and road crossing

HV joint-bay excavation and cable interface preparation

Controlled excavation around existing underground services

Discuss a similar project

Talk to our team about your utility infrastructure civil works.

Get In Touch
Back to Projects